top of page


Piazza Gerusalemme 7 Milano
The work on this site was:
-
Maintenance of frontal and lateral facade surfaces through partial demolition, reconstruction, double reinforced skimming and final painting with operators qualified to work by positioning on ropes;
-
Maintenance of balcony ceilings and faceplate surfaces through partial demolition, reconstruction, double reinforced skimming and final painting with operators qualified to work by positioning on ropes;
-
Painting with enamel of a specific type of the metal elements present on the facade and of the parapets of the balconies with operators qualified to work by positioning on ropes;
-
Gutter channel replacement with operators on truck-mounted PLE (Elevating Work Platform).
Project Gallery

bottom of page























